Customization: | Available |
---|---|
Type: | Flat Die Platen Wheel |
Voltage: | 380V 415V |
Still deciding? Get samples of US$ 500/kg
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Jinan Jinneng Machinery Co., LTD specializes in designing and manufacturing biomass pellet machinery and complete production lines with advanced technology.
Our Wood Pellet Production Line is ideal for agro-forestry residues such as straw, cotton stalk, rice husk, peanut shell, bamboo, empty fruit branch, pulverized coal, and waste paper.
Experience the durability and efficiency of our Biomass Wood Pellet Machine for all your biomass pellet production needs.
Model | Power (kw) | Capacity(kgs/h) | Weight(kgs) | Dimension(mm) |
JN560 | 90+1.5+0.37+1.5 | 1000-1200 | 4200 | 2300x1250x1950 |
JN560P | 110+1.5+0.37+1.5 | 1200-1500 | 4500 | 2300x1250x1950 |
JN560X | 132+1.5+0.37+1.5 | 1500-2000 | 5000 | 2300x1250x1950 |
JN700 | 160+1.5+0.37+1.5 | 1500-2000 | 6200 | 2800x1400x2100 |
JN850 | 220+3+0.37(0.55)+2.2 | 2000-3000 | 14500 | 3200x1630x2300 |
Learn how to efficiently produce pellets using our high-quality machinery.
Utilize a Wood Chipper or Wood Crusher to transform wood logs or chips into smaller pieces.
Use a Dryer to reduce moisture content to 8-15%, ideal for pelletizing.
Feed materials into the pellet machine gradually for optimal results.
For large-scale production, use a screw feeder for stable raw material feeding.
Cool the pellets using a pellet cooler before proceeding to the next step.
Run the pellets through a vibrating sieve to separate good pellets from broken ones or powder.
Use a pellet packing machine to pack the high-quality pellets efficiently.
Product Description by Jinan Jinneng Machinery Co., LTD
Q: What is your payment term?
A: We require a T/T payment with a 30% down payment, and the balance must be settled before shipment.
Q: What is your main market?
A: Our main markets include South America, Eastern Europe, Southeast Asia, Africa, Oceania, and Eastern Asia.
Q: What is your producing time?
A: The production time varies depending on the machines ordered, typically ranging from 10 to 30 days.
Q: What documents can you offer?
A: We provide invoices, packing lists, contracts, instructions, customs declarations, certificates of origin, and CE certifications. For any additional requirements, please consult our service staff.
Q: How do you handle quality problems with equipment?
A: We take full responsibility for any quality issues. Our team will inspect the machine to identify the problem and provide necessary parts for replacement.
Q: How are the equipments installed?
A: We offer on-site installation and commissioning support by sending 1-2 engineers to the local plant at a rate of 150USD per person per day. Our service team will guide you on the preparation needed in advance and train your workers on equipment usage and product optimization.